中国CCC认证
90 days
* it could result in a delay in processing:
if application documents are not complete,
if there are problems with testing in the Test Lab,
if there is a deviation in the audit.
Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2
Plant is classified after the initial audit in A, B, C, D.
A: Factory audit takes place once every 2 years.
B or C: Factory audit takes place once a year.
D: Factory audit takes place at least twice a year.
Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2
Initial Audit: 2 - 4 man day per model series
FI audit: 1 - 2 man day per model series
Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,
CCAP-C11-01: 2014 / A1 page 14, item 10.3.2
Factory audit is performed according to IR CNCA-C11-01 Appendix 5
- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)
-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.
-Overview control: control of property, model and supplier of core material and core components, etc.
- Checking product compliance: running tests, final tests, etc.
Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.
Product Check: Requalification Test
Change control: control of change request, etc.
Control of serious quality problems: customer complaint, recall, etc.
Source: IR CNCA-C11-01 Appendix 5
-Application form
License in copy
Questionnaire including brief information about the company, production process, list of core production facilities, list of core test instruments, proof of registered trademark, etc.
Car structure and technical parameters
-COP control plan
-Declaration: how is type, series defined
-Declaration: how is VIN defined
-Explanation: we distinguish the different types by external marking
-Declaration: Operating instructions in Chinese
-COC certificate
-Review
-Quality Manual
-Quality system certificates in copy
-Etc.
Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1
Step 1: Group car first after series defined by manufacturer
Step 2: Units are removed from the same series
It can not be defined as a unit if:
- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.
- car series is not equal
- position of the engine is not equal (front, middle, rear)
- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)
- Drive is not equal (four-wheel, non-four-wheel)
- Sum of the axis is not equal
- Etc.
Within one unit:
- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2
- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15
- Limit parameters (total weight, distribution of front and rear axle): 20%
- Etc.
Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)
Limit within one unit: Engine KW: 30%, Displacement: 20%
Limit value for engine KW: 50%, engine capacity: 50%
Limit within one unit: total weight: 20%
Source: IR CNCA-C11-01 Appendix 2
See CCAP-C11-01: 2014 / A1 page 29-45
See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27
你按你的速度工作。 您可以通过我们的门户独立处理您的项目,并询问个人支持。 因此,我们承诺有机会设计自己的流程
我们为您提供机会进行自己的认证流程,但不必放弃专业知识或经验丰富的员工的支持。 在线系统专为各种认证而设计,为您提供常见问题列表,以及现成的表格和表格,以及一个模块,用于澄清与我们的员工之间的问题。
在我们快速的时间里,商业生活的变化是不断的伴随。 它可以很快被捣毁。 这有内部和外部原因。 CS概述了变更过程中的一致性。
我们只有有限的时间和财力,想要提供全面的服务,合作只有在相关组织中有意义。 这些有一个可靠的结构,以及良好的人际和谐。